Analysis of the Effectiveness of Component Maintenance on PT.XYZ Water Pump Machines through the Life Cycle Cost (LCC) Approach
DOI:
https://doi.org/10.26877/asset.v7i2.856Keywords:
Cost, Maintenance Intervals, Maintenance Optimization, Life Cycle Costs, Distribution PumpsAbstract
Machine maintenance is an important factor in supporting a manufacturing process that is competitive in the market. Therefore, every company must carry out regular machine maintenance to ensure the machine operates optimally. The aim of this research is to identify damage that may occur to the pump engine and analyze pump maintenance costs which include the cost of repairing or replacing components. The method used in this research is the Life Cycle Cost (LCC) method. The research results show that the maintenance interval for each Bearing component is 1044 hours, Shaft 64 hours, Impeller 76 hours, Gasket 91 hours, Rotor 103 hours, and Bearing Housing 110 hours. The optimal total cost usage at the age of 3 years is IDR. 3,129,542,106/year with the optimal number of mechanics, namely 3 people, previously there were 5 people.
References
[1] Muhammad Bagus Maulana, & Widyaningrum, D. (2023). Analysis of the Effectiveness of Automatic Lathes Using the OEE and FMEA Methods. Advance Sustainable Science, Engineering and Technology (ASSET), 5, 10.
[2] 2. Dwi Cahyono, S., Handoko, F., & Budiharti, N. (2020). Penerapan Efektivitas Mesin Debarker Menggunakan Overall Equipment Effectiveness (Studi pada PT. Tri Tunggal Laksana Unit Blitar). Jurnal Teknologi Dan Manajemen Industri, 6(2), 12–17. https://doi.org/10.36040/jtmi.v6i2.3012
[3] 3. Timothy Anugrah Sugiarto, & Endang Pudji W. (2023). Analisa Pemeliharaan Mesin Printer Dengan Reliability Centred Maintenance (RCM) II Dan Life Cycle Cost (LCC) Di CV. XYZ. Jurnal Ilmiah Teknik Informatika Dan Komunikasi, 3(2), 144–158. https://doi.org/10.55606/juitik.v3i2.509
[4] Bilianto, B. Y., & Ekawati, Y. (2017). Pengukuran Efektivitas Mesin Menggunakan Overall Equipment Effectiveness Untuk Dasar Usulan Perbaikan. Jurnal Ilmiah Teknik Industri, 15(2), 116. https://doi.org/10.23917/jiti.v15i2.21412. Dwi Cahyono, S., Handoko, F., & Budiharti, N. (2020). Penerapan Efektivitas Mesin Debarker Menggunakan Overall Equipment Effectiveness (Studi pada PT. Tri Tunggal Laksana Unit Blitar). Jurnal Teknologi Dan Manajemen Industri, 6(2), 12–17. https://doi.org/10.36040/jtmi.v6i2.3012
[5] Jiwantoro, A., Argo, B. D., & Nugroho, W. A. (2013). Analisis Efektivitas Mesin Penggiling Tebu dengan Penerapan Total Productive Maintenance (In Press, JKPTB Vol 1 No 2). Jurnal Keteknikan Pertanian Tropis Dan Biosistem, 1(2), 18–28.
[6] F. Wahyudi, “Estimasi Pemeliharaan Jalan Daerah Berdasarkan Program Krms (Kabupaten Road Management System) Dan Lcca (Life Cycle Cost Analysis),” Jurnal Riset Rekayasa Sipil, vol. 3, no.8, pp. 73-78, 2021.
[7] S. Adam, “Pengembangan Model Data Livestream Kuantitas Dan Kontinuitas Air Pdam Berbasis Sistem Informasi Geografis,” Surabaya: Jakad Media Publishing, 2023.
[8] P. Iqbal, “Analisis Perawatan (Maintenance) Mesin Screw Press Di Pabrik Kelapa Sawit Dengan Metode Failure Mode And Effect Analysis,” Jitekh, vol. 1, no. 9, pp. 104-110, 2021.
[9] N. Fikri Nasrulloh, “Analisa Core Issu Pada Mehchine Maintenance Di Satuan Pelatanan (Satpel) Bandung Uptd,” Teknologinusantara, vol. 2, no. 4, pp. 45-59, 2023.
[10] W. Ahmad, “Pemeliharaan Dan Perawatan Pada Pompa Ipam Ngangel 1,” Jurnal Teknologi Dan Manajemen Sistem Industri, vol. 1, no. 2, pp. 7-12, 2022.
[11] P. Nicco, “Perbandingan Efisiensi Energi Solar Water Heater (Swh) Dan Electric Water Heater (Ewh) Dalam Skala Rumah Tangga Menggunakan Life Cycle Cost(Lcc),” Jurnal Artesis, vol. 1, no. 6, pp. 62-68, 2023.
[12] T. Hani, “Penghitungan Unit Cost (Uc) Dan Penyusunan Tarif Rumah Sakit Dengan Metode Double Distribution (Dd),” Sleman: Deepublish, 2020.
[13] N. Muslih, “Manfaat Perlunya Manajemen Perawatan,” in Buletin Utama Teknik, 2021, pp. 248-252.
[14] N. Eka, “Analisis Umur Mesin Dan Total Biaya Pada Mesin Press Menggunakan Metode Life Cycle Cost Di Pt. Xyz,” Jurnal Manajemen Industri Dan Teknologi, vol. 3, no. 11, pp. 128-140, 2020.
[15] A. Zaenal, “Akuntansi Manajemen,” Sleman: Deepublish, 2020.
[16] P. Grace, “Analisis Life Cycle Cost Pada Pembangunan Gedung,” Jurnal Sipil Statik, vol. 1, no. 43, pp.549-556, 2020.
[17] N. Winda, “Engineering Asset Management (Pengantar Manajemen Aset Industri Berbasis Iso 55000),” Jakarta: Universitas Islam Indonesia, 2020.
[18] R. Buyung, “ Life Cycle Cost (Lcc) Pada Proyek Pembangunan Gedung Akuntansi Universitas Negeri Manado,” Jurnal Sipil Statik, vol. 1, no. 51, pp. 1527-1536, 2020.
[19] A. Firman, “Penjadwalan Preventive Maintenancepada Mesin Mixing Dalam Produksi Brick Batu Tahan Api Dengan Menggunakan Metode Age Replacement Pada Pt. Loka Refractories Wira Jatim,” Jurnal Manajemeen Industri Dan Teknologi, vol. 1, no. 14, pp. 144-155, 2021.
[20] Y. Desrina, “Life Cycle Assessment Dan Life Cycle Cost Untuk Serat Kenaf,” Jurnal Rekayasa Sistem Industri, vol. 1, no. 18, pp. 213-224, 2020.