Development of Performance Assessment Tools for Supervision Consultants in Infrastructure Projects
DOI:
https://doi.org/10.26877/asset.v8i2.2284Keywords:
Assessment rubric, infrastructure performance, performance assessment system, supervisory consultant evaluation, toll road indicatorsAbstract
The construction of toll roads requires supervision consultants capable of ensuring project quality, time, and cost performance, yet a structured and measurable assessment framework is lacking. This study develops a comprehensive performance assessment rubric for toll road supervision consultants using quantitative methods, including a literature review, a survey of 50 respondents, validation by six experts, and an application test by 12 evaluators. Data were analyzed using validity and reliability tests, Mann–Whitney U, AHP, TOPSIS, and ROC methods. The results identified 18 valid and reliable indicators grouped into three dimensions soft skills, technical skills, and project supervision. The most critical indicators were QA/QC (C=0.810), periodic reporting (0.782), and work volume management (0.711). Final dimension weights were 40% for technical skills, 30% for soft skills, and 30% for project supervision. Application of the rubric indicated consultants’ performance remained in the “Average” category, highlighting areas for measurable improvement in supervision practice.
References
[1] J. A. Alsuliman, “Causes of delay in Saudi public construction projects,” Alexandria engineering journal, vol. 58, no. 2, pp. 801–808, 2019 https://doi.org/10.1016/j.aej.2019.07.002
[2] S. D. Kebede and Z. Tiewei, “Public work contract laws on project delivery systems and their nexus with project efficiency: evidence from Ethiopia,” Heliyon, vol. 7, no. 3, 2021 10.1016/j.heliyon.2021.e06462
[3] S. Pheng and R. Premnath, Construction quality and the economy. Springer, 2019.
[4] N. Berk and S. Biçen, “Causality between the construction sector and GDP growth in emerging countries: the case of Turkey,” in 10th Annual International Conference on Mediterranean Studies, 2017, pp. 10–13. DOI: https://doi.org/10.30958/ajms.4-1-2
[5] Z. Elburz and K. M. Cubukcu, “Spatial effects of transport infrastructure on regional growth: the case of Turkey,” Spatial Information Research, vol. 29, no. 1, pp. 19–30, 2021. DOI: https://doi.org/10.1007/s41324-020-00332-y
[6] G. Klarenberg, R. Muñoz-Carpena, M. A. Campo-Bescós, and S. G. Perz, “Highway paving in the southwestern Amazon alters long-term trends and drivers of regional vegetation dynamics,” Heliyon, vol. 4, no. 8, 2018 10.1016/j.heliyon.2018.e00721
[7] G. Shi, J. Shan, L. Ding, P. Ye, Y. Li, and N. Jiang, “Urban road network expansion and its driving variables: a case study of Nanjing City,” Int. J. Environ. Res. Public Health, vol. 16, no. 13, p. 2318, 2019 https://doi.org/10.3390/ijerph16132318
[8] T. Ammar, M. Abdel-Monem, and K. El-Dash, “Risk factors causing cost overruns in road networks,” Ain Shams Engineering Journal, vol. 13, no. 5, p. 101720, 2022 https://doi.org/10.1016/j.asej.2022.101720
[9] E. Haerani, F. Syafria, F. Lestari, and I. Marzuki, “Classification academic data using machine learning for decision making process,” Journal of Applied Engineering and Technological Science (JAETS), vol. 4, no. 2, pp. 644–654, 2023.
[10] Z. Ding, J. Wang, J. Zuo, and W. Gong, “Key performance indicators for regional construction supervision systems in China,” Engineering Management Journal, vol. 29, no. 3, pp. 179–188, 2017. DOI: https://doi.org/10.1080/10429247.2017.1342477
[11] Y. Amare, E. T. Quezon, and M. Busier, “Causes of delays during construction phase of road projects due to the failures of contractor, consultant, and employer in Addis Ababa City Road Authority,” Int. J. Sci. Eng. Res., vol. 8, no. 3, pp. 15–25, 2017.
[12] V. D. Y. Nhi, “Technology-Supported Student-Centered Science Learning and Digital Competence Development in Upper Secondary Classrooms,” International Journal of Environment, Engineering and Education, vol. 8, no. 1, pp. 97–121 10.55151/ijeedu.v8i1.426
[13] A. Ibrahim, T. Zayed, and Z. Lafhaj, “Enhancing construction performance: a critical review of performance measurement practices at the project level,” Buildings, vol. 14, no. 7, p. 1988, 2024 https://doi.org/10.3390/buildings14071988
[14] A. D. Rarasati and W. P. Rahman, “Indicators in the Performance Evaluation Rubric for Supervision Consultants in Toll Road Construction Projects,” Journal La Multiapp, vol. 6, no. 5, pp. 1126–1142, 2025 https://doi.org/10.37899/journallamultiapp.v6i5.2318
[15] A. Nova et al., “Performance evaluation of construction consultants using Smart-PLS and IPA,” Journal of Educational Management Research, vol. 4, no. 2, pp. 657–673, 2025 https://doi.org/10.61987/jemr.v4i2.1019
[16] R. Rauf, L. K. Wulandari, and Y. P. Manaha, “Performance Evaluation of Supervisory Consultants on Road Reconstruction Projects in East Kalimantan, Indonesia”
[17] K. Manoharan, P. Dissanayake, C. Pathirana, D. Deegahawature, and R. Silva, “The Impacts of Critical Construction Supervisory Competencies on the Efficiency, Productivity and Sustainability of Road Construction Operations in Sri Lanka,” 2023.
[18] J. Rounds and R. Segner, “Construction Supervision,” Construction Supervision, 2011.
[19] R. Apriani and I. Prasetia, “Analysis of Project Owner Satisfaction on the Performance of Supervisory Consultants on Road Construction Projects at Road and Bridge Maintenance Section of the Banjarbaru City Public Works Service, South Kalimantan.,” Technium, vol. 5, 2023 10.47577/technium.v5i.8377
[20] K. Wibowo, M. Adhar, and F. Fachruddin, “The Effect of Supervision Consultant Performance on the Implementation Quality of the National Road Construction,” JACEE (Journal of Advanced Civil and Environmental Engineering), vol. 5, no. 1, pp. 51–60 https://dx.doi.org/10.30659/jacee.5.1.51-60
[21] R. W. Kimingi and J. Olango, “Influence of Project Supervision on Performance of Road Construction Projects, Uasin Gishu County,” 2020.
[22] J. A. Alsuliman, “Causes of delay in Saudi public construction projects,” Alexandria Engineering Journal, vol. 58, no. 2, pp. 801–808, 2019, doi: https://doi.org/10.1016/j.aej.2019.07.002
[23] M. Setyo, H. Muhammadun, and W. Oetomo, “ANALYSIS OF THE INFLUENCE AND RELATIONSHIP OF THE EFFECT OF PERFORMANCE FACTORS ON THE QUALITY PERFORMANCE OF SUPERVISORY CONSULTANTS”.
[24] D. Abas, E. R. Ahadian, and M. T. Y. Saputra, “Analisis Kepuasan Pengguna Jasa Terhadap Kinerja Konsultan Pengawas Pada Pekerjaan Konstruksi Di Kota Ternate,” Journal of Science and Engineering, vol. 4, no. 2, pp. 120–129, 2021.
[25] F. O. Yoneda, T. Yuono, and G. Nursetyo, “PENGUKURAN KINERJA KONSULTAN PENGAWAS KONSTRUKSI JALAN DENGAN METODE CSI,” Jurnal Teknik Sipil dan Arsitektur, vol. 28, no. 2, pp. 29–35, 2023.
[26] I. N. Y. Astana, I. N. M. Jaya, and K. A. S. D. Handayani, “Customer Satisfaction Analysis of Supervisory Consultant Construction Performance at Badung Regency Public Works and Spatial Planning,” Journal of Asian Multicultural Research for Economy and Management Study, vol. 4, no. 2, pp. 1–14, 2023 https://doi.org/10.47616/jamrems.v4i2.397
[27] D. Abas, E. R. Ahadian, and M. T. Y. Saputra, “Analisis Kepuasan Pengguna Jasa Terhadap Kinerja Konsultan Pengawas Pada Pekerjaan Konstruksi Di Kota Ternate,” Journal of Science and Engineering, vol. 4, no. 2, pp. 120–129, 2021.
[28] R. W. Kimingi and J. Olango, “Influence of Project Supervision on Performance of Road Construction Projects, Uasin Gishu County,” 2020.
[29] A. Noor, “Analysis of the Satisfaction of BBPJN XI Banjarmasin on the Performance of Supervisory Consultants on Bridge Construction Projects in South Kalimantan,” Lambung Mangkurat University. South Kalimantan, 2020.
[30] K. Wibowo, M. Adhar, and F. Fachruddin, “The Effect of Supervision Consultant Performance on the Implementation Quality of the National Road Construction,” JACEE (Journal of Advanced Civil and Environmental Engineering), vol. 5, no. 1, pp. 51–60. DOI: https://dx.doi.org/10.30659/jacee.5.1.51-60
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Advance Sustainable Science Engineering and Technology

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.




